top of page
Guidlines Image.png

Preparation Guide

Our best advice is to always employ a professional to carry out any significant alterations to your property. Having said that you can carry out the work that is sometimes required to make the installation of a stove possible, provided that you follow and adhere to the relevant regulations as detailed in Approved Document J - Combustion applicances and fuel storage systems. We provide a link to this document below together with some *additional guides to assist you.

Chimney Pots

01

Chimney Pot

A chimney pot is required support the flue liner and Bird Guard and Cowl. Most styles of existing pots can be adapted for use. If none exists one must be added.

02

Remove Old Appliances

If you have an existing stove or fire that is connected to the Gas, Water or Electric supply, you must seek the services of a qualified professional to safely disconnect and terminate supplies and pipework before you start work on the fireplace.

Old Gas Appliances
Prepared Fireplace

03

Prepare the Fireplace

This is how a prepared fireplace should look. The interior of the opening must be lined or rendered with a fireproof material such as lime render or cement board. Plaster or any combustible material must not be used. The dimensions of the opening should be sufficient to accommodate your stove of choice.

04

Install Hearth

A non-combustible hearth is required beneath your stove.
The front edge of the hearth must extend a minimum of 300mm beyond the front of the stove and the surface of the hearth must be at least 12.0mm above the finished floor surface.

​

Available as an optional extra - fitted by us on the same day as the stove is installed.

T shaped slate hearth

A general guide to preparing a Fireplace Opening for a Stove Installation

Many homeowners choose to open an existing fireplace before having a wood-burning or multi-fuel stove installed. Whilst this can be an exciting stage of the project, it's important to understand that fireplace alterations can involve structural considerations which must comply with Approved Document J of the Building Regulations.

 

Removing Old Appliances

If you have an existing stove or fire that is connected to the Gas, Water or Electric supply, you must seek the services of a qualified professional to safely disconnect and terminate supplies and pipework before you start work on the fireplace.

 

Getting Started

Removing plaster, opening up a blocked fireplace, or enlarging an existing chamber can sometimes uncover issues that were not previously visible, such as older alterations, weakened brickwork, or lintels that may need attention. If you are unsure about the condition or structure of the fireplace or chimney, we recommend seeking professional advice before carrying out any demolition or structural work.

​

Measure accurately

Make sure the opening that you are creating provides adequate space for the stove of your choice. Refer to the manufacturers specifications to check distances required around and above the stove.

 

Structural Considerations

In some cases, what appears to be a simple knockout can uncover significant structural work that must be completed before a stove can be installed safely.

If a fireplace opening is enlarged, a suitable supporting lintel may be required to carry the weight of the chimney breast above. The size, material and positioning of any lintel should be assessed by a suitably qualified person.

Care must be taken to ensure that adequate access to the chimney flue is available after a new lintel is installed.

 

Making the Chamber Ready

When preparing a fireplace chamber, consideration must be given to the distance between the stove and any combustible materials, including:

  • Timber lintels

  • Wooden mantel beams

  • Plasterboard with combustible backing

  • Timber studwork

  • Flooring materials

  • Decorative surrounds

Whilst Approved Document J sets out the fundamental requirements for safe installation, every stove model has its own specified clearance distances published by the manufacturer. These dimensions can vary significantly between appliances.

 

 

Building Regulations – Approved Document J

Any fireplace, chimney, hearth, flue or stove installation must comply with Approved Document J of the Building Regulations, which covers the safe installation of combustion appliances and fuel storage systems

 

Some of the key considerations include:

  • Adequate structural support above the fireplace opening.

  • Correct sizing of the fireplace recess and clearances to combustible materials.

  • Suitable ventilation requirements.

  • The condition and suitability of the chimney and flue.

  • Hearth construction and dimensions.

  • Safe distances between the appliance and surrounding materials.

  • Appropriate access for inspection, sweeping and maintenance.

These requirements exist to ensure the appliance operates safely and efficiently whilst protecting the occupants and structure of the property.​

​

Our Recommendation

At Elite Heat Stoves, safety is always our priority. Every property is different, and what may be appropriate in one home may not be suitable in another. Obtaining expert advice from a suitably qualified builder, structural specialist of HETAS registered engineer at the outset can help avoid unnecessary costs, delays, and potential safety issues later in the installation process.

 

NOTE.

The above information is provided as a general guide and should not be considered as definitive instructions. Elite Heat Stoves Ltd accepts no responsibility or liability for any work carried out by Home Owners, Tenants or their appointed contractors.

 

5th September 2026

5kW Tiverton Stove

Tiverton Stove Package & Installation Information

5kW Sterling Stove

Sterling Stove Package & Installation Information

8kW Farmlingham Stove

Farmlingham Stove Package & Installation Information

Approved Document "J"

Regulations pertaining to the installation of solid fuel appliances.

bottom of page